Merge branch 'develop' into patch-2

This commit is contained in:
Sidharth Vinod
2024-01-29 13:29:04 +05:30
committed by GitHub
112 changed files with 3498 additions and 2601 deletions

View File

@@ -459,9 +459,9 @@ The different cardinality options are :
- `0..1` Zero or One
- `1..*` One or more
- `*` Many
- `n` n {where n>1}
- `0..n` zero to n {where n>1}
- `1..n` one to n {where n>1}
- `n` n (where n>1)
- `0..n` zero to n (where n>1)
- `1..n` one to n (where n>1)
Cardinality can be easily defined by placing the text option within quotes `"` before or after a given arrow. For example:
@@ -766,9 +766,30 @@ Beginner's tip—a full example using interactive links in an HTML page:
## Styling
### Styling a node
### Styling a node (v10.7.0+)
It is possible to apply specific styles such as a thicker border or a different background color to individual nodes. This is done by predefining classes in css styles that can be applied from the graph definition using the `cssClass` statement or the `:::` short hand.
It is possible to apply specific styles such as a thicker border or a different background color to an individual node using the `style` keyword.
```mermaid-example
classDiagram
class Animal
class Mineral
style Animal fill:#f9f,stroke:#333,stroke-width:4px
style Mineral fill:#bbf,stroke:#f66,stroke-width:2px,color:#fff,stroke-dasharray: 5 5
```
```mermaid
classDiagram
class Animal
class Mineral
style Animal fill:#f9f,stroke:#333,stroke-width:4px
style Mineral fill:#bbf,stroke:#f66,stroke-width:2px,color:#fff,stroke-dasharray: 5 5
```
#### Classes
More convenient than defining the style every time is to define a class of styles and attach this class to the nodes that
should have a different look. This is done by predefining classes in css styles that can be applied from the graph definition using the `cssClass` statement or the `:::` short hand.
```html
<style>

View File

@@ -11,6 +11,13 @@ Flowcharts are composed of **nodes** (geometric shapes) and **edges** (arrows or
> **Warning**
> If you are using the word "end" in a Flowchart node, capitalize the entire word or any of the letters (e.g., "End" or "END"), or apply this [workaround](https://github.com/mermaid-js/mermaid/issues/1444#issuecomment-639528897). Typing "end" in all lowercase letters will break the Flowchart.
> **Warning**
> If you are using the letter "o" or "x" as the first letter in a connecting Flowchart node, add a space before the letter or capitalize the letter (e.g., "dev--- ops", "dev---Ops").
>
> Typing "A---oB" will create a [circle edge](#circle-edge-example).
>
> Typing "A---xB" will create a [cross edge](#cross-edge-example).
### A node (default)
```mermaid-example
@@ -488,23 +495,38 @@ flowchart TB
B --> D
```
### New arrow types
## New arrow types
There are new types of arrows supported as per below:
There are new types of arrows supported:
- circle edge
- cross edge
### Circle edge example
```mermaid-example
flowchart LR
A --o B
B --x C
```
```mermaid
flowchart LR
A --o B
B --x C
```
### Multi directional arrows
### Cross edge example
```mermaid-example
flowchart LR
A --x B
```
```mermaid
flowchart LR
A --x B
```
## Multi directional arrows
There is the possibility to use multidirectional arrows.
@@ -1112,7 +1134,19 @@ flowchart TD
B-->E(A fa:fa-camera-retro perhaps?)
```
Mermaid is compatible with Font Awesome up to version 5, Free icons only. Check that the icons you use are from the [supported set of icons](https://fontawesome.com/v5/search?o=r&m=free).
Mermaid supports Font Awesome if the CSS is included on the website.
Mermaid does not have any restriction on the version of Font Awesome that can be used.
Please refer the [Official Font Awesome Documentation](https://fontawesome.com/start) on how to include it in your website.
Adding this snippet in the `<head>` would add support for Font Awesome v6.5.1
```html
<link
href="https://cdnjs.cloudflare.com/ajax/libs/font-awesome/6.5.1/css/all.min.css"
rel="stylesheet"
/>
```
## Graph declarations with spaces between vertices and link and without semicolon

View File

@@ -114,7 +114,30 @@ gantt
Add another diagram to demo page :48h
```
It is possible to set multiple dependencies separated by space:
Tasks are by default sequential. A task start date defaults to the end date of the preceding task.
A colon, `:`, separates the task title from its metadata.
Metadata items are separated by a comma, `,`. Valid tags are `active`, `done`, `crit`, and `milestone`. Tags are optional, but if used, they must be specified first.
After processing the tags, the remaining metadata items are interpreted as follows:
1. If a single item is specified, it determines when the task ends. It can either be a specific date/time or a duration. If a duration is specified, it is added to the start date of the task to determine the end date of the task, taking into account any exclusions.
2. If two items are specified, the last item is interpreted as in the previous case. The first item can either specify an explicit start date/time (in the format specified by `dateFormat`) or reference another task using `after <otherTaskID> [[otherTaskID2 [otherTaskID3]]...]`. In the latter case, the start date of the task will be set according to the latest end date of any referenced task.
3. If three items are specified, the last two will be interpreted as in the previous case. The first item will denote the ID of the task, which can be referenced using the `later <taskID>` syntax.
| Metadata syntax | Start date | End date | ID |
| ------------------------------------------ | --------------------------------------------------- | ------------------------------------------- | -------- |
| `<taskID>, <startDate>, <endDate>` | `startdate` as interpreted using `dateformat` | `endDate` as interpreted using `dateformat` | `taskID` |
| `<taskID>, <startDate>, <length>` | `startdate` as interpreted using `dateformat` | Start date + `length` | `taskID` |
| `<taskID>, after <otherTaskId>, <endDate>` | End date of previously specified task `otherTaskID` | `endDate` as interpreted using `dateformat` | `taskID` |
| `<taskID>, after <otherTaskId>, <length>` | End date of previously specified task `otherTaskID` | Start date + `length` | `taskID` |
| `<startDate>, <endDate>` | `startdate` as interpreted using `dateformat` | `enddate` as interpreted using `dateformat` | n/a |
| `<startDate>, <length>` | `startdate` as interpreted using `dateformat` | Start date + `length` | n/a |
| `after <otherTaskID>, <endDate>` | End date of previously specified task `otherTaskID` | `enddate` as interpreted using `dateformat` | n/a |
| `after <otherTaskID>, <length>` | End date of previously specified task `otherTaskID` | Start date + `length` | n/a |
| `<endDate>` | End date of preceding task | `enddate` as interpreted using `dateformat` | n/a |
| `<length>` | End date of preceding task | Start date + `length` | n/a |
For simplicity, the table does not show the use of multiple tasks listed with the `after` keyword. Here is an example of how to use it and how it's interpreted:
```mermaid-example
gantt
@@ -420,11 +443,21 @@ mermaid.ganttConfig can be set to a JSON string with config parameters or the co
```javascript
mermaid.ganttConfig = {
titleTopMargin: 25,
barHeight: 20,
barGap: 4,
topPadding: 75,
sidePadding: 75,
titleTopMargin: 25, // Margin top for the text over the diagram
barHeight: 20, // The height of the bars in the graph
barGap: 4, // The margin between the different activities in the gantt diagram
topPadding: 75, // Margin between title and gantt diagram and between axis and gantt diagram.
rightPadding: 75, // The space allocated for the section name to the right of the activities
leftPadding: 75, // The space allocated for the section name to the left of the activities
gridLineStartPadding: 10, // Vertical starting position of the grid lines
fontSize: 12, // Font size
sectionFontSize: 24, // Font size for sections
numberSectionStyles: 1, // The number of alternating section styles
axisFormat: '%d/%m', // Date/time format of the axis
tickInterval: '1 week', // Axis ticks
topAxis: true, // When this flag is set, date labels will be added to the top of the chart
displayMode: 'compact', // Turns compact mode on
weekday: 'sunday', // On which day a week-based interval should start
};
```

View File

@@ -131,6 +131,14 @@ sequenceDiagram
Bob->>Alice: I agree
```
#### Unfixable actor/participant creation/deletion error
If an error of the following type occurs when creating or deleting an actor/participant:
> The destroyed participant **participant-name** does not have an associated destroying message after its declaration. Please check the sequence diagram.
And fixing diagram code does not get rid of this error and rendering of all other diagrams results in the same error, then you need to update the mermaid version to (v10.7.0+).
### Grouping / Box
The actor(s) can be grouped in vertical boxes. You can define a color (if not, it will be transparent) and/or a descriptive label using the following notation: