- ---- A Gantt chart is a type of bar chart, first developed by Karol Adamiecki in 1896, and - independently by Henry Gantt in the 1910s, that illustrates a project schedule and the - amount of time it would take for any one project to finish. Gantt charts illustrate - number of days between the start and finish dates of the terminal elements and summary - elements of a project. -
-
- Gantt Charts will record each scheduled task as one continuous bar that extends from the - left to the right. The x axis represents time and the y records the different tasks and - the order in which they are to be completed. -
-
- It is important to remember that when a date, day, or collection of dates specific to a
- task are "excluded", the Gantt Chart will accommodate those changes by extending an equal
- number of days, towards the right, not by creating a gap inside the task. As shown here
-
-
- However, if the excluded dates are between two tasks that are set to start consecutively,
- the excluded dates will be skipped graphically and left blank, and the following task will
- begin after the end of the excluded dates. As shown here
-
-
- A Gantt chart is useful for tracking the amount of time it would take before a project is - finished, but it can also be used to graphically represent "non-working days", with a few - tweaks. -
-- Mermaid can render Gantt diagrams as SVG, PNG or a MarkDown link that can be pasted into - docs. -
--gantt - title A Gantt Diagram - dateFormat YYYY-MM-DD - section Section - A task :a1, 2014-01-01, 30d - Another task :after a1, 20d - section Another - Task in Another :2014-01-12, 12d - another task :24d
-gantt - dateFormat YYYY-MM-DD - title Adding GANTT diagram functionality to mermaid - excludes weekends - %% (`excludes` accepts specific dates in YYYY-MM-DD format, days of the week ("sunday") or "weekends", but not the word "weekdays".) - - section A section - Completed task :done, des1, 2014-01-06,2014-01-08 - Active task :active, des2, 2014-01-09, 3d - Future task : des3, after des2, 5d - Future task2 : des4, after des3, 5d - - section Critical tasks - Completed task in the critical line :crit, done, 2014-01-06,24h - Implement parser and jison :crit, done, after des1, 2d - Create tests for parser :crit, active, 3d - Future task in critical line :crit, 5d - Create tests for renderer :2d - Add to mermaid :1d - Functionality added :milestone, 2014-01-25, 0d - - section Documentation - Describe gantt syntax :active, a1, after des1, 3d - Add gantt diagram to demo page :after a1 , 20h - Add another diagram to demo page :doc1, after a1 , 48h - - section Last section - Describe gantt syntax :after doc1, 3d - Add gantt diagram to demo page :20h - Add another diagram to demo page :48h
- Tasks are by default sequential. A task start date defaults to the end date of the - preceding task. -
-
- A colon, :
, separates the task title from its metadata. Metadata items are
- separated by a comma, ,
. Valid tags are active
,
- done
, crit
, and milestone
. Tags are optional, but
- if used, they must be specified first. After processing the tags, the remaining metadata
- items are interpreted as follows:
-
dateFormat
) or reference another task using
- after <otherTaskID> [[otherTaskID2 [otherTaskID3]]...]
. In the latter
- case, the start date of the task will be set according to the latest end date of any
- referenced task.
- later <taskID>
syntax.
- Metadata syntax | -Start date | -End date | -ID | -
---|---|---|---|
<taskID>, <startDate>, <endDate> |
- startdate as interpreted using dateformat |
- endDate as interpreted using dateformat |
- taskID |
-
<taskID>, <startDate>, <length> |
- startdate as interpreted using dateformat |
- Start date + length |
- taskID |
-
<taskID>, after <otherTaskId>, <endDate> |
- End date of previously specified task otherTaskID |
- endDate as interpreted using dateformat |
- taskID |
-
<taskID>, after <otherTaskId>, <length> |
- End date of previously specified task otherTaskID |
- Start date + length |
- taskID |
-
<startDate>, <endDate> |
- startdate as interpreted using dateformat |
- enddate as interpreted using dateformat |
- n/a | -
<startDate>, <length> |
- startdate as interpreted using dateformat |
- Start date + length |
- n/a | -
after <otherTaskID>, <endDate> |
- End date of previously specified task otherTaskID |
- enddate as interpreted using dateformat |
- n/a | -
after <otherTaskID>, <length> |
- End date of previously specified task otherTaskID |
- Start date + length |
- n/a | -
<endDate> |
- End date of preceding task | -enddate as interpreted using dateformat |
- n/a | -
<length> |
- End date of preceding task | -Start date + length |
- n/a | -
- For simplicity, the table does not show the use of multiple tasks listed with the
- after
keyword. Here is an example of how to use it and how it's interpreted:
-
-gantt - apple :a, 2017-07-20, 1w - banana :crit, b, 2017-07-23, 1d - cherry :active, c, after b a, 1d
- The title
is an optional string to be displayed at the top of the
- Gantt chart to describe the chart as a whole.
-
- You can divide the chart into various sections, for example to separate different parts of - a project like development and documentation. -
-
- To do so, start a line with the section
keyword and give it a name. (Note
- that unlike with the title for the entire chart, this name is
- required.
-
- You can add milestones to the diagrams. Milestones differ from tasks as they represent a
- single instant in time and are identified by the keyword milestone
. Below is
- an example on how to use milestones. As you may notice, the exact location of the
- milestone is determined by the initial date for the milestone and the "duration" of the
- task this way: initial date+duration/2.
-
-gantt - dateFormat HH:mm - axisFormat %H:%M - Initial milestone : milestone, m1, 17:49, 2m - Task A : 10m - Task B : 5m - Final milestone : milestone, m2, 18:08, 4m
- dateFormat
defines the format of the date input of your
- gantt elements. How these dates are represented in the rendered chart
- output are defined by axisFormat
.
-
- The default input date format is YYYY-MM-DD
. You can define your custom
- dateFormat
.
-
dateFormat YYYY-MM-DD
-
- The following formatting options are supported:
-Input | -Example | -Description | -
---|---|---|
YYYY |
- 2014 | -4 digit year | -
YY |
- 14 | -2 digit year | -
Q |
- 1..4 | -Quarter of year. Sets month to first month in quarter. | -
M MM |
- 1..12 | -Month number | -
MMM MMMM |
- January..Dec | -Month name in locale set by dayjs.locale() |
-
D DD |
- 1..31 | -Day of month | -
Do |
- 1st..31st | -Day of month with ordinal | -
DDD DDDD |
- 1..365 | -Day of year | -
X |
- 1410715640.579 | -Unix timestamp | -
x |
- 1410715640579 | -Unix ms timestamp | -
H HH |
- 0..23 | -24 hour time | -
h hh |
- 1..12 | -12 hour time used with a A . |
-
a A |
- am pm | -Post or ante meridiem | -
m mm |
- 0..59 | -Minutes | -
s ss |
- 0..59 | -Seconds | -
S |
- 0..9 | -Tenths of a second | -
SS |
- 0..99 | -Hundreds of a second | -
SSS |
- 0..999 | -Thousandths of a second | -
Z ZZ |
- +12:00 | -Offset from UTC as +-HH:mm, +-HHmm, or Z | -
- More info in: - https://day.js.org/docs/en/parse/string-format/ -
-
- The default output date format is YYYY-MM-DD
. You can define your custom
- axisFormat
, like 2020-Q1
for the first quarter of the year 2020.
-
axisFormat %Y-%m-%d
-
- The following formatting strings are supported:
-Format | -Definition | -
---|---|
%a | -abbreviated weekday name | -
%A | -full weekday name | -
%b | -abbreviated month name | -
%B | -full month name | -
%c | -date and time, as "%a %b %e %H:%M:%S %Y" | -
%d | -zero-padded day of the month as a decimal number [01,31] | -
%e | -space-padded day of the month as a decimal number [ 1,31]; equivalent to %_d | -
%H | -hour (24-hour clock) as a decimal number [00,23] | -
%I | -hour (12-hour clock) as a decimal number [01,12] | -
%j | -day of the year as a decimal number [001,366] | -
%m | -month as a decimal number [01,12] | -
%M | -minute as a decimal number [00,59] | -
%L | -milliseconds as a decimal number [000, 999] | -
%p | -either AM or PM | -
%S | -second as a decimal number [00,61] | -
%U | -- week number of the year (Sunday as the first day of the week) as a decimal number - [00,53] - | -
%w | -weekday as a decimal number [0(Sunday),6] | -
%W | -- week number of the year (Monday as the first day of the week) as a decimal number - [00,53] - | -
%x | -date, as "%m/%d/%Y" | -
%X | -time, as "%H:%M:%S" | -
%y | -year without century as a decimal number [00,99] | -
%Y | -year with century as a decimal number | -
%Z | -time zone offset, such as "-0700" | -
%% | -a literal "%" character | -
- More info in: - https://github.com/d3/d3-time-format/tree/v4.0.0#locale_format -
-
- The default output ticks are auto. You can custom your tickInterval
, like
- 1day
or 1week
.
-
tickInterval 1day
-
- The pattern is:
-/^([1-9][0-9]*)(millisecond|second|minute|hour|day|week|month)$/;
-
- - More info in: - https://github.com/d3/d3-time#interval_every -
-
- Week-based tickInterval
s start the week on sunday by default. If you wish to
- specify another weekday on which the tickInterval
should start, use the
- weekday
option:
-
-gantt - tickInterval 1week - weekday monday
`millisecond` and `second` support was added in vMERMAID_RELEASE_VERSION
-
- - The compact mode allows you to display multiple tasks in the same row. Compact mode can be - enabled for a gantt chart by setting the display mode of the graph via preceeding YAML - settings. -
----- -displayMode: compact ---- -gantt - title A Gantt Diagram - dateFormat YYYY-MM-DD - - section Section - A task :a1, 2014-01-01, 30d - Another task :a2, 2014-01-20, 25d - Another one :a3, 2014-02-10, 20d
- Comments can be entered within a gantt chart, which will be ignored by the parser.
- Comments need to be on their own line and must be prefaced with %%
(double
- percent signs). Any text after the start of the comment to the next newline will be
- treated as a comment, including any diagram syntax.
-
-gantt - title A Gantt Diagram - %% This is a comment - dateFormat YYYY-MM-DD - section Section - A task :a1, 2014-01-01, 30d - Another task :after a1, 20d - section Another - Task in Another :2014-01-12, 12d - another task :24d
- Styling of the Gantt diagram is done by defining a number of CSS classes. During - rendering, these classes are extracted from the file located at - src/diagrams/gantt/styles.js -
-Class | -Description | -
---|---|
grid.tick | -Styling for the Grid Lines | -
grid.path | -Styling for the Grid's borders | -
.taskText | -Task Text Styling | -
.taskTextOutsideRight | -Styling for Task Text that exceeds the activity bar towards the right. | -
.taskTextOutsideLeft | -Styling for Task Text that exceeds the activity bar, towards the left. | -
todayMarker | -Toggle and Styling for the "Today Marker" | -
.grid .tick {
- stroke: lightgrey;
- opacity: 0.3;
- shape-rendering: crispEdges;
-}
-.grid path {
- stroke-width: 0;
-}
-
-#tag {
- color: white;
- background: #fa283d;
- width: 150px;
- position: absolute;
- display: none;
- padding: 3px 6px;
- margin-left: -80px;
- font-size: 11px;
-}
-
-#tag:before {
- border: solid transparent;
- content: ' ';
- height: 0;
- left: 50%;
- margin-left: -5px;
- position: absolute;
- width: 0;
- border-width: 10px;
- border-bottom-color: #fa283d;
- top: -20px;
-}
-.taskText {
- fill: white;
- text-anchor: middle;
-}
-.taskTextOutsideRight {
- fill: black;
- text-anchor: start;
-}
-.taskTextOutsideLeft {
- fill: black;
- text-anchor: end;
-}
-
-
- You can style or hide the marker for the current date. To style it, add a value for the
- todayMarker
key.
-
todayMarker stroke-width:5px,stroke:#0f0,opacity:0.5
-
- To hide the marker, set todayMarker
to off
.
todayMarker off
-
- It is possible to adjust the margins for rendering the gantt diagram.
-
- This is done by defining the ganttConfig
part of the configuration object.
- How to use the CLI is described in the
- mermaidCLI page.
-
- mermaid.ganttConfig can be set to a JSON string with config parameters or the - corresponding object. -
-mermaid.ganttConfig = {
- titleTopMargin: 25,
- barHeight: 20,
- barGap: 4,
- topPadding: 75,
- sidePadding: 75,
-};
-
- Param | -Description | -Default value | -
---|---|---|
mirrorActor | -Turns on/off the rendering of actors below the diagram as well as above it | -false | -
bottomMarginAdj | -- Adjusts how far down the graph ended. Wide borders styles with css could generate - unwanted clipping which is why this config param exists. - | -1 | -
- It is possible to bind a click event to a task. The click can lead to either a javascript
- callback or to a link which will be opened in the current browser tab.
- Note: This functionality is disabled when using
- securityLevel='strict'
and enabled when using
- securityLevel='loose'
.
-
click taskId call callback(arguments)
-click taskId href URL
-
- Beginner's tip—a full example using interactive links in an html context:
-<body>
- <pre class="mermaid">
- gantt
- dateFormat YYYY-MM-DD
-
- section Clickable
- Visit mermaidjs :active, cl1, 2014-01-07, 3d
- Print arguments :cl2, after cl1, 3d
- Print task :cl3, after cl2, 3d
-
- click cl1 href "https://mermaidjs.github.io/"
- click cl2 call printArguments("test1", "test2", test3)
- click cl3 call printTask()
- </pre>
-
- <script>
- const printArguments = function (arg1, arg2, arg3) {
- alert('printArguments called with arguments: ' + arg1 + ', ' + arg2 + ', ' + arg3);
- };
- const printTask = function (taskId) {
- alert('taskId: ' + taskId);
- };
- const config = {
- startOnLoad: true,
- securityLevel: 'loose',
- };
- mermaid.initialize(config);
- </script>
-</body>
-
- -gantt - title Git Issues - days since last update - dateFormat X - axisFormat %s - section Issue19062 - 71 : 0, 71 - section Issue19401 - 36 : 0, 36 - section Issue193 - 34 : 0, 34 - section Issue7441 - 9 : 0, 9 - section Issue1300 - 5 : 0, 5